Sector 3 7 bedroom Single Family House For Sale
118 Dockside Cir, Weston, FL 33327

$1,325,000
Sold
Mila Bogatov
Mila Bogatov
Luxury Real Estate Broker

Details


  • MLS Number:A11150898
  • Virtual Tour: YES
  • List Price: $1,200,000
  • Sold Price: $1,325,000
  • Living Area: 4668 Ft² / 434 M²
  • Price Per Foot/Meter: $284 / $3,055
  • Bedrooms:7
  • Full Baths:7
  • Half Baths:1
  • Maintenance:$590
  • Taxes:$14,761
  • Year Built:1996
  • Pets Allowed:YES
  • Waterfront:YES
  • Listing Date:January 25, 2022
  • Sold Date: March 15, 2022
  • Days On Market:48

Description


THE LARGEST HOME in one of Weston’s most desirable neighborhoods – THE LANDINGS. This luxurious lakefront estate with a pool is a dream home for a family. 7 Bedrooms (one converted to an office & one other bedroom converted into a playroom), 7 full baths and 1 half bath, on a 20,800 SF lot. This one story home offers a large patio surrounding the pool perfect for entertaining. The open concept design let you enjoy pool and lake views from the Master Bedroom, Living Room, Kitchen and Family Room. Other futures included are; steam room, cabana bath with frameless glass, outdoor shower, built in Murphy Bed in one of the bedrooms, high ceilings and marble floors throughout. Great location Access to excellent A-rated public schools, near to major highways, dining and shopping.

Features


  • Floor:Marble
  • Interior Feature:BedroomOnMainLevel, FirstFloorEntry, MainLevelPrimary
  • Exterior Feature:Fence, OutdoorShower
  • Waterfront:LakeFront

Location


Request Information
Mila Bogatov
Mila Bogatov
Luxury Real Estate Broker